X

0577-86860737

English
swbicon

Index>News

swbicon

Index>News>Installation of fluorine lined check valve

TIME:2015-08-29 Source: This site

Installation of fluorine lined check valve

       check valve There are many points to pay attention to during installation, and it is necessary to pay attention to the process of installing fluorine lined check valves. Only for these two aspects
When installing a fluorine lined check valve, it is important to check the valve markings to see if they match the requirements for use with the check valve. Is the flow direction label on the shell consistent with the flow direction on the pipeline. Installation should be done as horizontally as possible with the valve stem facing upwards, and the valve should not be lifted using a handwheel during installation.
If the interface between the flange sealing of the pipeline and the valve at both ends is metal during installation, a fluoroplastic sealing gasket needs to be added.
If the pipeline has sufficient strength to withstand the weight and operating torque of the valve, it is not necessary to set up supports, otherwise specialized support points need to be set up.
After installation and pressure testing of the system, the valve needs to be in the fully open position.

衬氟止回阀

Prev 2012-05-08

How to leverage the advantages of clamp type fluorine lined butterfly valves

Next 2015-09-02

Function and use of fluorine lined check valve

Hotline 0577-86860737

Copyright © 2026 Zhejiang Lierduo Valve Co., Ltd. All Rights Reserved.

浙ICP备10012193号-3